| Core Generic Units |
| BCWS1717 |
Work safely in the construction industry |
1 |
2 |
| BCMC0311 |
Carry out measurements and calculations |
1 |
3 |
| BCWS0111 |
Work safely at heights |
2 |
2 |
| Core Industry Units |
| BCII1217 |
Analyse and communicate industry information |
4 |
3 |
| BCAB0111 |
Apply building codes and standards to the construction process for low rise building projects |
4 |
5 |
| Specialised Units |
| BCRM0211 |
Place and fix reinforcement materials |
2 |
2 |
| BCFS0611 |
Erect and dismantle formwork for footings and slabs on ground |
2 |
4 |
| BCPC0111 |
Carry out high performance concreting |
3 |
2 |
| BCRT0611 |
Erect roof trusses |
3 |
4 |
| BCFR0211 |
Apply float and render to straight and curved surfaces |
3 |
3 |
| BCRS0411 |
Restore and renovate solid plasterwork |
3 |
4 |
| BTCA0111 |
Prepare surfaces for tiling application |
3 |
2 |
| BCFT0211 |
Fix floor tiles |
3 |
3 |
| BCWT0311 |
Fix wall tiles |
3 |
3 |
| BCSP0211 |
Prepare surfaces for painting |
3 |
3 |
| BCSS2122 |
Set up, move and dismantle scaffolding up to 4 meters |
3 |
3 |
| BCIP0111 |
Install cast plaster block work |
3 |
2 |
| Elective Units |
| PCSW0111 |
Collect and store roof water |
2 |
1 |
| GSBF0112 |
Apply basic first aid |
1 |
2 |
| BCEC0111 |
Identify and produce estimated costs for building and construction projects |
4 |
5 |
| MEAW0917 |
Perform routine manual arc welding |
2 |
2 |